15.02.19

108th Air Defense Brigade Complex

Complete site design for a 340-acre new brigade complex to support a Brigade HQ, three battalion HQs, Company Operations Facilities, Dining Facility, six barracks, and four Tactical Equipment Maintenance Facilities. Part of the design was to complete a Life Cycle Cost Analysis to evaluate three HVAC options for the Complex.   Complete site design was provided,

15.02.19

Dormitory Renovation, Shaw AFB

CEMS provided civil and structural engineering design and LEED commissioning services for an existing 25,150 SF, three-story dormitory renovated to provide 13 dormitory quads with four private bedrooms and bathrooms with shared laundry, kitchen, and social spaces per quad.  Design for this building will allow for LEED Silver Certification. Systems commissioning services were also provided.

15.02.19

Radcliffe Manor

Renovated from a historic 1930 school, Radcliffe Manor consists of two stately three-story buildings , one original and one new, containing 63 two-bedroom apartments, large corridors, high ceilings, large windows and open breezeways reminiscent of the original structures. Each comfortable apartment features 835 square feet and features modern amenities, resident-controlled access, private parking and a

15.02.19

Habersham Village

A ten building living complex providing a 3-story, 6-unit condominiums. The structure was wood frame over a slab and stem wall design for IBC wind and seismic loading for the location of project.  Each unit was identical in layout and function.   Building fire protection was provided via fire protection sprinkler system. CEMS provided all plumbing,