This project was developed in two Phases. In 2008, CEMS Engineering completed the Customer Criteria Document (Master Plan) for the replacement of the Radar Approach Control (RAPCON) facility (12,130 SF), airfield tower (135 in height and 9,600 SF), and base operations facility (13,580 SF). Planning included a three-phased project with construction of new facilities and demolition of existing facilities.